Explore
Explore
Explore
Pick a lens. Pick a row. The dossier opens beside it.
REE · primary
Bottom line
Praseodymium sits on 3 federal critical-minerals lists. Prices rose 32% over the past year (-6%/yr over 4y).
At a glance
Price · 2025
74dollars per kilogram
USGS MCS (Praseodymium oxide, 99.99% min)
Price trend
+32% 1Y
-6%/yr · 4Y CAGR
From ore to use
lifecycle flow
-
Reported at rare-earth group level
-
-
Process engineering
3 PROMMIS flowsheets
PROMMIS · uky
Open workbench →Primary REE recovery from coal byproducts: leaching → solvent extraction (rougher + cleaner) → precipitation → roasting. Reports per-metal recoveries + overall product purity at the canonical UKy reference flowsheet.
commodity: praseodymium · suggested axis: leach_liquid_feed_rate_l_per_hr · y: overall_ree_recovery_pct
PROMMIS · hydrogen_decrepitation
Open workbench →End-of-life route: H2-atmosphere embrittlement of NdFeB permanent magnets recovered from HDDs - the physical pre-treatment that makes the magnet matrix millable before separation.
commodity: praseodymium · suggested axis: operating_temperature_k · y: nd_mass_frac_product_pct
PROMMIS · cmi
Open workbench →End-of-life route: the CMI hydrometallurgical process - copper-nitrate dissolution → pH adjustment → oxalate precipitation → calcination to Nd-oxide. A wet alternative to hydrogen decrepitation for NdFeB recycling.
Coverage
Provenance
-
-
commodity: praseodymium · suggested axis: nd_magnet_conversion · y: nd_recovery_pct
Methodology
The eight-stage lens, the observed-vs-estimated membrane, stage-honest supply, per-stage concentration, ownership resolution and the demand lens - the full method is illustrated live on copper, nickel and lithium.
lbnl room ac 2025
midstream_components_seed
ni43101_deposits
oeko 2012 ewaste criticals
7 sources · titles open the source card · url opens the publisher